How Does a Robust Disaster Recovery Plan Address Infrastructure Failure for an RFQ Provider?
A robust DR plan ensures business continuity and minimizes downtime after a major failure. It defines a low Recovery Time Objective (RTO) and Recovery Point Objective (RPO) through redundant systems and frequent data backups.
The plan includes automated failover to a secondary, geographically separate data center (active-passive or active-active). Infrastructure-as-Code (IaC) is often used to quickly and reliably provision replacement infrastructure, ensuring rapid recovery.